2256: Difference between revisions

From Starfleet Command
Jump to navigation Jump to search
Line 30: Line 30:
: ''The NCC is not yet identified for this vessel.''
: ''The NCC is not yet identified for this vessel.''


* The final ''Constitution'' Flight I to be upgraded to Flight II configuration is completed. ''USS Potemkin'' (NCC-1711) is the only ''Constitution'' to not receive the upgrade.<ref name=Constitution>[[Guide: Constitution]]</ref>
* The final ''Constitution'' Flight I to be upgraded to Flight II configuration is completed. ''USS Potemkin'' (NCC-1711) is the only ''Constitution'' to not receive the upgrade; instead, she begins a conversion to the ''Bonhomme Richard'' standard.<ref name=Constitution>[[Guide: Constitution]]</ref>


==New Technology==
==New Technology==

Revision as of 09:28, 1 March 2020

Historical Events

  • Early: USS Guernsey, the last of the Bode class heavy scouts, is retired.[1]
  • Six mothballed vessels of the Strider class courier/scout are upgraded and re-engined.[2]
  • The original Ptolemy class fleet tug/tenders start to receive their new warp nacelles during scheduled overhauls.[3]
  • USS Penelope (NCC-G1415, Sherman class) falls into Orion hands with a full load of dilithium; a special forces operation to retrieve it is successful.[4]
  • The final Alexis class cargo drone enters service.[4]
  • The ships of the three Rochester sub-classes start undergoing refits.[5]
  • Existing Flight II Loknars start receiving the Flight IIA upgrades.[6]
Loknars of the Flight IA standard will be upgraded to Flight IIA upon the completion of the process for the Flight IIs.
  • The final new-build Flight II Loknar class frigate enters service with Star Fleet.[6]
  • USS Ares (NCC-1650) undergoes a refit.[7]
  • The final T'pari surveyor is completed for the Vulcan Science Directorate.[8]
  • The final Arcadia class fleet tanker/tender is completed.[9]
  • The purchase of further Arcadias in a basic armed transport configuration is considered, but both Logistics Command and SMM decide upon heavier designs.[9]
  • Construction of the Keith class surveyor begins.
The NCC is not yet identified for this vessel.
  • The final Constitution Flight I to be upgraded to Flight II configuration is completed. USS Potemkin (NCC-1711) is the only Constitution to not receive the upgrade; instead, she begins a conversion to the Bonhomme Richard standard.[11]

New Technology

References





2255 23rd century
2250s
2257