2270s: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
| Line 16: | Line 16: | ||
<br> | <br> | ||
==Events== | ==Events== | ||
* The complex [[Help:Scratchpad/Registry Codes|Naval Construction Code system]] that was initiated in [[2161]] and modified in [[2175]] is overhauled, with all ships receiving 'pure' NCC registration codes.<ref name=Sherman>[[Guide: Sherman]]</ref> | |||
* '''Late''': The orderly withdrawal and deactivation of the remaining ''Cahuya'' class survey cruisers begins.''<ref name=Venture>[[Guide: Venture]]</ref> | * '''Late''': The orderly withdrawal and deactivation of the remaining ''Cahuya'' class survey cruisers begins.''<ref name=Venture>[[Guide: Venture]]</ref> | ||
<br> | <br> | ||
==References== | ==References== | ||
<references /> | <references /> | ||
Revision as of 19:37, 28 March 2017
Summary
Years
Events
- The complex Naval Construction Code system that was initiated in 2161 and modified in 2175 is overhauled, with all ships receiving 'pure' NCC registration codes.[1]
- Late: The orderly withdrawal and deactivation of the remaining Cahuya class survey cruisers begins.[2]
References
| 2260s | Category:Timeline 23rd century |
2280s |