2063: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 11: | Line 11: | ||
: ''The source says that six hulls have been launched by early [[2064]], so the assumption is that a majority of them were launched post-First Contact in [[2063]].'' | : ''The source says that six hulls have been launched by early [[2064]], so the assumption is that a majority of them were launched post-First Contact in [[2063]].'' | ||
<br> | |||
==New Technology== | ==New Technology== | ||
* [[Structural Integrity Field | * [[Build: Structural Integrity Field|Class A Structural Integrity Field]] | ||
* [[Build: Backup SIF|Backup SIFs]] | |||
* [[Build: Manufacturing Systems|Mark I Industrial Fabrication Unit]] | |||
* [[Build: Warps Propulsion System|Mark I Warp Nacelles]] | |||
* [[Build: Warps Propulsion System|Class 0 Plasma Injector Systems]] | |||
* [[Build: Impulse Propulsion System|Type 1 Main Impulse Engines]] | |||
* [[Build: Impulse Propulsion System|Class Alpha Acceleration Upgrade]] | |||
* [[Build: Warp Engines|Mark I Warp Engines]] | |||
* [[Build: Sensor Systems|Mark 0 Long Range Sensors]] | |||
* [[Build: Beam_Weapons_#Table|Sorac 1.5 Plus Class laser]] | |||
* [[Build: Emergency Power Systems|Type B Emergency Power System]] | |||
<br> | |||
==References== | ==References== | ||
<references /> | <references /> | ||
<br><br> | <br><br> | ||
{{Timeline nav}} | {{Timeline nav}} | ||
Revision as of 06:57, 17 May 2015
Historical Events
- 05 April: Zefram Cochrane tests the Phoenix, demonstrating warp drive by achieving Warp 1 for approximately one minute in the Sol system.[1]
- The Guide has the launch and first contact event occurring a day earlier; the assumption follows the canon Star Trek: First Contact movie.
- 05 April: A passing Vulcan ship, the T'Plana-Hath, detects the warp signature and lands in Bozeman later that evening, officially making first contact with Humans.[2]
- 26 April: Zefram Cochrane releases all documents on his warp technology into the public domain.[3]
- Three weeks after the T’Plana-Hath lands on Earth.
- Four new Liberty hulls have been launched to orbit for installation of systems, in a desperate bid to show teeth in front of the Vulcan expeditions.[4]
- The source says that six hulls have been launched by early 2064, so the assumption is that a majority of them were launched post-First Contact in 2063.
New Technology
References
| 2062 | 21st century 2060s |
2064 |