2240: Difference between revisions

From Starfleet Command
Jump to navigation Jump to search
No edit summary
Line 9: Line 9:
* [[Altair]] is torn apart by factions for and against continued UFP membership.<ref name=WayWarrior/>   
* [[Altair]] is torn apart by factions for and against continued UFP membership.<ref name=WayWarrior/>   


* The ''Baton Rouge'' class heavy cruisers start receiving the new dilithium regulation engine refits. ''USS Brandenburg'' (NCC-1413) completes her yard period before ''USS Adelaide'' (NCC-1424) begins hers.<ref name=BatonRouge>[[Guide: Baton Rouge]]</ref>
* The ''Baton Rouge'' class heavy cruisers start receiving the new dilithium regulation engine refits. ''USS Brandenburg'' (NCC-1413) completes her [[Sol]] system yard period before ''USS Adelaide'' (NCC-1424) begins hers.<ref name=BatonRouge>[[Guide: Baton Rouge]]</ref>
: ''The text indicates the ships -following the first- started receiving the engine after [[2239]].''
: ''The text indicates the ships -following the first- started receiving the engine after [[2239]].''


<br>
<br>
==New Technology==
==New Technology==
* [[Build: Warps_Propulsion_System_#6.1_Warp_Propulsion_System|Warp core]] maximum overload extended to 14 minutes.
* [[Build: Warps_Propulsion_System_#6.1_Warp_Propulsion_System|Warp core]] maximum overload extended to 14 minutes.

Revision as of 11:40, 16 April 2016

Historical Events

  • The Babel Conference is held.[1]
The source suggests two conferences were held (and boycotted by dissident planets) between the 2238 and (planned) 2241 conferences.
  • The Melev government changes course and denounces the anti-UFP separatist movement and received Federation military aid (before reverting back to a separatist stance).[1]
  • Izar exerts pressure on the various Rigelian governments to withdraw from the Federation.[1]
  • Altair is torn apart by factions for and against continued UFP membership.[1]
  • The Baton Rouge class heavy cruisers start receiving the new dilithium regulation engine refits. USS Brandenburg (NCC-1413) completes her Sol system yard period before USS Adelaide (NCC-1424) begins hers.[2]
The text indicates the ships -following the first- started receiving the engine after 2239.


New Technology


References





2239 23rd century
2240s
2241