2157: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 5: | Line 5: | ||
: ''The month is conjecture.'' | : ''The month is conjecture.'' | ||
* '''July''': Concurrent design, development and construction of the '' | * '''July''': Concurrent design, development and construction of the ''Achilles'' and ''Helena'' class cruisers begins.<ref name=Achilles>[[Guide: Achilles]]</ref> | ||
: ''Month is conjecture, though the project took 8 months total for the first '' | : ''Month is conjecture, though the project took 8 months total for the first ''Achilles' to be fully produced in [[2158]].'' | ||
* '''September''': ''USS Candace'' (S-5665) re-launches, is hijacked by stranded Romulans, recovered by the ''USS Jackson'' (''Cavalry'' class) and returned to drydock for repairs.<ref name=Mercury/> | * '''September''': ''USS Candace'' (S-5665) re-launches, is hijacked by stranded Romulans, recovered by the ''USS Jackson'' (''Cavalry'' class) and returned to drydock for repairs.<ref name=Mercury/> | ||
| Line 26: | Line 26: | ||
* The ''Minuteman'' design is selected for the [[UESF]]'s new deep-space destroyer class.<ref name=Minuteman>[[Guide: Minuteman]]</ref> | * The ''Minuteman'' design is selected for the [[UESF]]'s new deep-space destroyer class.<ref name=Minuteman>[[Guide: Minuteman]]</ref> | ||
* UESF Command composes the ‘seventy per cent deal’, where 70% of the cost of an ''[[Guide: Enterprise|Enterprise]]'' class explorer will be budgeted to other ship classes for each one built.<ref name= | * UESF Command composes the ‘seventy per cent deal’, where 70% of the cost of an ''[[Guide: Enterprise|Enterprise]]'' class explorer will be budgeted to other ship classes for each one built.<ref name=Achilles>[[Guide: Achilles]]</ref> | ||
<br> | <br> | ||
Revision as of 06:53, 25 March 2017
Historical Events
- June: The last of six Mercury class scouts (in one year) is lost, presumably to Romulan action.[1]
- June: USS Candace (S-5665) is damaged in an encounter with Romulan forces.[1]
- The month is conjecture.
- July: Concurrent design, development and construction of the Achilles and Helena class cruisers begins.[2]
- Month is conjecture, though the project took 8 months total for the first Achilles' to be fully produced in 2158.
- September: USS Candace (S-5665) re-launches, is hijacked by stranded Romulans, recovered by the USS Jackson (Cavalry class) and returned to drydock for repairs.[1]
- The hijacking occurred 3 months after its initial encounter in June.
- The original Durance class transports started to receive wartime weapons upgrades.[3]
- The Romulans penetrate the interplanetary security of the Sector 5B Mining Complex, destroying this important allied resource.[4]
- The year of the attack is moved forward to accommodate the stated year of official hostilities.
- A Mercury hull under construction is modified to become the first Doppler class scout.[5]
- The loss of six more Daedalus corvettes by the end of this year leads the class to be relegated to secondary roles shortly thereafter.[7]
- The Ganges class destroyers receive the 1-layer graviton/subspace globular forcefield during upgrade.[8]
- UESF Command composes the ‘seventy per cent deal’, where 70% of the cost of an Enterprise class explorer will be budgeted to other ship classes for each one built.[2]
New Technology
References
| 2156 | 22nd century 2150s |
2158 |