Build:Construction Categories: Difference between revisions

From Starfleet Command
Jump to navigation Jump to search
created
 
br
Line 2: Line 2:
==3.2 Construction Categories ==
==3.2 Construction Categories ==
Each of the following systems and attributes fall into one of seven categories: '''Hull (4.0), Personnel Systems (5.0), Propulsion Systems (6.0), Power Systems (7.0), Operations Systems (8.0), Tactical Systems (9.0) and Auxiliary Spacecraft Systems (10.0)'''.<br>
Each of the following systems and attributes fall into one of seven categories: '''Hull (4.0), Personnel Systems (5.0), Propulsion Systems (6.0), Power Systems (7.0), Operations Systems (8.0), Tactical Systems (9.0) and Auxiliary Spacecraft Systems (10.0)'''.<br>
Note: in some cases, equipment may become available for use in a prototype, or even production models, years before indicated in the below tables. For every decade (or portion of) that a certain type of equipment is used early, the SU requirement is increased by 20%. Therefore, a phaser VIII installed on the [[USS Reliant (NCC-1864)|''USS Reliant'']] in [[2270]] would be introduced 14 years ‘early’, and would therefore be 40% larger than that formally introduced ‘on time.’
Note: in some cases, equipment may become available for use in a prototype, or even production models, years before indicated in the below tables. For every decade (or portion of) that a certain type of equipment is used early, the SU requirement is increased by 20%. Therefore, a phaser VIII installed on the [[USS Reliant (NCC-1864)|''USS Reliant'']] in [[2270]] would be introduced 14 years ‘early’, and would therefore be 40% larger than that formally introduced ‘on time.’
<br><br>
<br><br>

Revision as of 21:59, 28 December 2007

3.2 Construction Categories

Each of the following systems and attributes fall into one of seven categories: Hull (4.0), Personnel Systems (5.0), Propulsion Systems (6.0), Power Systems (7.0), Operations Systems (8.0), Tactical Systems (9.0) and Auxiliary Spacecraft Systems (10.0).

Note: in some cases, equipment may become available for use in a prototype, or even production models, years before indicated in the below tables. For every decade (or portion of) that a certain type of equipment is used early, the SU requirement is increased by 20%. Therefore, a phaser VIII installed on the USS Reliant in 2270 would be introduced 14 years ‘early’, and would therefore be 40% larger than that formally introduced ‘on time.’


Construction Rules Index