1990: Difference between revisions

From Starfleet Command
Jump to navigation Jump to search
 
Line 3: Line 3:


* The DY-110 ''Apex'' series of mission spacecraft begins construction in an exclusive contract with [[Great Khanate]]-associated operators.<ref name=DYsublight>[[Guide: DY sublight series]]</ref>
* The DY-110 ''Apex'' series of mission spacecraft begins construction in an exclusive contract with [[Great Khanate]]-associated operators.<ref name=DYsublight>[[Guide: DY sublight series]]</ref>
* Production of the DY-A2 launch booster starts.<ref name=DYsublight>[[Guide: DY sublight series]]</ref>


==Checklist==
==Checklist==

Latest revision as of 14:08, 17 September 2020

Historical Events

  • The DY-A1 launch and the DY-B1 interplanetary boosters are certified for operations.[1]
  • The DY-110 Apex series of mission spacecraft begins construction in an exclusive contract with Great Khanate-associated operators.[1]
  • Production of the DY-A2 launch booster starts.[1]

Checklist

  • Design of the Apex class begins. (Once start month is established, design completion is 11 months later.)

New Technology

References






1989 20th century
1990s
1991