2145: Difference between revisions
Jump to navigation
Jump to search
m italics |
m corr |
||
| Line 2: | Line 2: | ||
*The ''Daedalus'' class survey cruiser begins operations with the [[UESF]], with the commisioning of the ''USS Horizon'', which begins test trials in the vicinity of ? Centauri, to verify operational safety. (The ''Daedalus'' prototype had been lost in [[2140]]).<ref>Guide: [[Daedalus (Guide)|Daedalus]]</ref> | *The ''Daedalus'' class survey cruiser begins operations with the [[UESF]], with the commisioning of the ''USS Horizon'', which begins test trials in the vicinity of ? Centauri, to verify operational safety. (The ''Daedalus'' prototype had been lost in [[2140]]).<ref>Guide: [[Daedalus (Guide)|Daedalus]]</ref> | ||
*'''August''': Construction on the first four ''Triton'' class hulls was completed.<ref>Guide: [[Triton (Guide)|Triton]]</ref> | *'''August''': Construction on the first four ''Triton'' class hulls was completed.<ref>Guide: [[Triton (Guide)|Triton]]</ref> | ||
'' | :''Month is assumed, based upon term "late [[2145]]."'' | ||
<br> | <br> | ||
Revision as of 20:44, 8 April 2008
Historical Events
- The Daedalus class survey cruiser begins operations with the UESF, with the commisioning of the USS Horizon, which begins test trials in the vicinity of ? Centauri, to verify operational safety. (The Daedalus prototype had been lost in 2140).[1]
- August: Construction on the first four Triton class hulls was completed.[2]
- Month is assumed, based upon term "late 2145."
New Technology
Reminders
References
| 2144 | 22nd century 2140s |
2146 |