2075: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 9: | Line 9: | ||
* The ''Franklin'' class scoutcraft enters service with the [[UESN]].<ref name=Franklin>[[Guide: Franklin]]</ref> | * The ''Franklin'' class scoutcraft enters service with the [[UESN]].<ref name=Franklin>[[Guide: Franklin]]</ref> | ||
* The space buoy marker system comes into being. The buoys are deployed to mark the first commercial spacelane network (as defined by the [[2073]] treaty). | |||
==Checklist== | |||
n/a | |||
==New Technology== | ==New Technology== | ||
* [[Warps Propulsion System (Build)|Mark 1.2A Warp Nacelles]] | * [[Warps Propulsion System (Build)|Mark 1.2A Warp Nacelles]] | ||
==Economics== | |||
n/a | |||
==References== | ==References== | ||
Revision as of 18:28, 22 December 2017
Historical Events
- Eighteen Vernes had been constructed, seventeen of them had attained warp capability, and sixteen had been launched on missions of exploration, to Epsilon Eridani, Altair, Arcturus and Sirius.[1]
- Preliminary designing and prototype testing began for the Messier cruiser class.[2]
- The Gibraltar Dam is completed. (SFC)
- The space buoy marker system comes into being. The buoys are deployed to mark the first commercial spacelane network (as defined by the 2073 treaty).
Checklist
n/a
New Technology
Economics
n/a
References
- ↑ Guide: Verne
- ↑ Guide: Messier
- ↑ Guide: DY warp series
- ↑ Guide: Franklin
| 2074 | 21st century 2070s |
2076 |