Build:Construction Categories: Difference between revisions
Jump to navigation
Jump to search
br |
|||
| Line 1: | Line 1: | ||
__TOC__ | __TOC__ | ||
==3.2 Construction Categories == | ==3.2 Construction Categories == | ||
Each of the following systems and attributes fall into one of seven categories: '''Hull (4.0), Personnel Systems (5.0), Propulsion Systems (6.0), Power Systems (7.0), Operations Systems (8.0), Tactical Systems (9.0) and Auxiliary Spacecraft Systems (10.0)'''.<br> | Each of the following systems and attributes fall into one of seven categories: '''Hull (4.0), Personnel Systems (5.0), Propulsion Systems (6.0), Power Systems (7.0), Operations Systems (8.0), Tactical Systems (9.0)''' and '''Auxiliary Spacecraft Systems (10.0)'''.<br> | ||
Note: in some cases, equipment may become available for use in a prototype, or even production models, years before indicated in the below tables. For every decade (or portion of) that a certain type of equipment is used early, the SU requirement is increased by 20%. Therefore, a phaser VIII installed on the [[USS Reliant (NCC-1864)|''USS Reliant'']] in [[2270]] would be introduced 14 years ‘early’, and would therefore be 40% larger than that formally introduced ‘on time.’ | Note: in some cases, equipment may become available for use in a prototype, or even production models, years before indicated in the below tables. For every decade (or portion of) that a certain type of equipment is used early, the SU requirement is increased by 20%. Therefore, a phaser VIII installed on the [[USS Reliant (NCC-1864)|''USS Reliant'']] in [[2270]] would be introduced 14 years ‘early’, and would therefore be 40% larger than that formally introduced ‘on time.’ | ||
Revision as of 06:39, 2 April 2014
3.2 Construction Categories
Each of the following systems and attributes fall into one of seven categories: Hull (4.0), Personnel Systems (5.0), Propulsion Systems (6.0), Power Systems (7.0), Operations Systems (8.0), Tactical Systems (9.0) and Auxiliary Spacecraft Systems (10.0).
Note: in some cases, equipment may become available for use in a prototype, or even production models, years before indicated in the below tables. For every decade (or portion of) that a certain type of equipment is used early, the SU requirement is increased by 20%. Therefore, a phaser VIII installed on the USS Reliant in 2270 would be introduced 14 years ‘early’, and would therefore be 40% larger than that formally introduced ‘on time.’